OFFShore Wind Farm Wind Turbine Coupling
1. Wind power is a renewable energy with mature technology and low cost, especially the clean energy technology of large-capacity offshore wind power, which will obtain huge development space.
2. In recent years, offshore wind power has developed rapidly and is an important development direction of global wind power generation. Compared with the application environment of onshore wind power, offshore wind power has higher requirements for the operation reliability and technology of components.
3. KUDOSWORLD adapt to the new trend of global energy development, and on the basis of decades of coupling design and manufacturing, we provide the world's wind power farms with the highest quality and performance Wind Turbine Couplings to help the development of new energy.
- Information
- Download
KUDOSWORLD Wind Turbine Coupling Distinguishing Features:
1. Able to compensate for high displacement deviations between shafts
2. Electrical isolation: to protect the running safety of equipment
3. Power transmission free of wear.
4. Steady shock free start up in loaded or unloaded state
5. Prevention of overload: to protect the safety of shaft end equipment
6. Buffering and damping, low noise
7. No maintenance, low wear, easy installation and disassembly, long service life
・Torque Limiters
When overload to be more than specified torque happened, slipping unit embedded in torque limiter cuts the power to protect power train components and it operates without remarkable decrease of torque during required life period. It is applied to over 2MW
・Shaft Connection
is easy to install because keyless type is applied when connecting shaft between generator and gearbox. Pretension nut enables to clamp bolt bv means of hand work without using hydraulic torque wrench
・Space Tube
When leakage current occurs, glass fiber reinforced plastic with superiority of electrical isolation and strength is applied in order to prevent the damage of power train components. It is designed to be able to endure temperature range of -30°Cto+70°C.
・Miscellaneous
Exterior coupling parts is designed to meet ISO 12944
Generally, KUDOSWORLD special Land Wind Farm Wind Turbine Coupling for offshore wind turbine is over 4MW.
Delivery Time
Payment method: prepayment + delivery payment, special prepayment discount for agents and old customers,
Delivery: According to different product types and order quantities, small models can be delivered in 4-6 weeks, and large models can be shipped in 10-12 weeks
Shipping method: sea, air, international express (small model + small quantity), support EXW, FOB, CIP and other ITEM